UCLA Spieker Aquatic Center
- University of California, Los Angeles
Los Angeles,
Calif
Programming, planning, construction documents and construction observation as required for the construction of a 25 yard x 52 meter “all deep” competition pool with 2 meter movable bulkhead, toe ledge(s) and air sparger, as well as a warming pool for divers. In addition, ADG provided schematic design and design development documents for the 10 / 7.5 / 5 / 3 meter diving platform, two (2) one meter, and two (2) three meter diving springboards.
|
|
|
Wildcat Recreation Center
- California State University at Chico
Chico,
Calif
Planning, construction documents and construction observation as required for the construction a 25 yard x 25 meter swimming pool with zero-depth entry and a 250 square foot hydrotherapy spa for California State University at Chico.
Cost: $1,833,005 (aquatics component)
|
|
|
Hendrix College Wellness & Athletic Center
- Hendrix College
Conway,
Arkansas
Programming, planning, construction documents and construction observation as required for the construction of a 25 yard x 25 meter swimming pool for Hendrix College.
Cost: $851,000 (aquatics component)
SqFt: 25 yard x 25 meter swimming pool
|
|
|
Gregory Gymnasium Aquatics Complex
- University of Texas at Austin
Austin,
Texas
Programming, planning, construction documents, and construction observation as required for the renovation of an indoor 25-yard "stretch" pool with movable bulkhead, and the addition of a new 25-yard x 30-meter lap / fitness pool and 8,000 square foot leisure pool for the University of Texas at Austin.
Cost: $1,480,467 (aquatics component)
|