Project Description
The team designing the renovation and addition to Georgia Tech’s Campus Recreation Center were faced with three key obstacles: One, it had to conceive a reuse of the 1996 Olympic aquatic venue occupying the very tight site. Two, in doing so, the design team could not demolish the venue’s towering roof structure, atop which are solar panels being used in a 25-year research project. Finally, the completed project needed to complement the surrounding campus architecture.
In the end, this cutting-edge student gathering space retained the pool shell, which was converted into a state-of-the- art natatorium. Above this space, a 175-foot continuous floor span — a structural engineering marvel in itself — was inserted to accommodate 60,000 square feet of gymnasium and multipurpose space. The original curved roof remained intact and now serves as the facility’s most distinctive feature, providing inspiration for a new main entry — the favorite feature of one panelist.
Primary exterior materials of brick, stone, metal panels and glass are compatible with nearby modern academic buildings, yet they also mimic more traditionally styled student housing structures.

Judges' Comments
A technically innovative solution using the existing structure as the basis for new construction.
— Art Bodwell
A highly complex transformation that creates a bold and dramatic natatorium space.
— Darryl Condon
The fitness room takes advantage of the lofty height, giving it a dramatic and spacious feel.
— Anita Moran
Project Details
Architect of Record: Hastings & Chivetta Architects Inc.
Aquatic Design Engineer: Counsilman•Hunsaker;
St. Louis, Mo.
Programming/Operational
Consultant: Ballard*King & Associates;
Highlands Ranch, Colo.
Funded By: Student fees
Major Facility Components:
Natatorium, three-story climbing wall, one squash and four racquetball courts, six-court gymnasium, multipurpose activity court, three group exercise studios, fitness center, elevated jogging track, outdoor recreation center, six meeting rooms, game room, café and administrative space.
Construction Cost: $37.25 million (rec center), $3 million (garage)
Square Feet: 300,000
Occupancy: August 2004
Vendors
Aerobics Flooring:
Action Floor Systems LLC
Basketball Backboards/Supports: Aalco Manufacturing Co.
Basketball Surfaces:
Action Floor Systems LLC
Climbing Walls:
Entre Prises USA Climbing Walls
Court Panels/Glass: Hollman Inc.
Divider Curtains: Aalco Manufacturing Co.
Fitness Center Flooring:
Everlast Performance Flooring
Lockers:
Lyon Workspace Products
Pool Lighting: Spi Lighting Group
Pool Scoreboard/Timing Systems:
Daktronics Inc.
Pool Water Play Features: Splashtacular
Scoreboards/Timing Systems:
Daktronics Inc.
Swimsuit Dryer: Extractor Corp.
Volleyball Nets and Standards:
Sports Imports Inc. (Senoh)