Advertisement

Facilities of Merit 2009: Chimo Aquatic and Fitness Centre


          Comments (0)         

View Large Image           Start Slideshow



Chimo Aquatic and Fitness Centre

Coquitlam, B.C.

Year in Showcase: 2009

Project Description

The Chimo Aquatic and Fitness Centre is situated adjacent to the existing Coquitlam Sports Centre and replaced the original Chimo Pool across the street.

Sustainable solutions are found throughout the facility. Multilevel operable overhead doors on both ends of the natatorium create natural cross-ventilation, reducing demand on the already efficient air-to-air heat exchange and dehumidification equipment; roof-mounted solar panels provide preheating for pool tanks; an overflow parking area features permeable surfacing; and bioswales reduce the rainwater discharge demand on storm sewers. All major landscaping elements were specified to minimize the impact on the natural habitat, and species indigenous to the Coquitlam area were chosen.

Key building features include a leisure pool, a 25-meter lap pool with 1- and 3-meter competition springboards, a hot pool, a steam room and a dry sauna. The 300-square-meter leisure pool is separated from the lap pool by the main north-facing central skylight, which allows diffuse light to filter into the space. The leisure pool contains a 20-meter warm lap area, a large beach entry, a lazy river, tot bubblers, spray arches, belle sprays, and a geyser ring. Health and wellness components include therapy rails, therapeutic sprays and an upper-level fitness area overlooking the natatorium.




Judges' Comments

An elegant solution that clothes a simple plan and program in a well-apportioned structure with a lot of natural light and visual interest.
— Bob McDonald

The structure doesn’t just shelter the swimming pools — it interacts with the environment to provide fresh air when desired, water heating when the sun’s out and the most appropriate natural light during any time of the day.
— Mike Pratl

The material palette is cool and metallic, and the exterior elevations are considered in a canonical modern style of levitating planes and horizontal window bands.
— Vik Jaunkalns


Project Details

Architect of Record: Hughes Condon Marler : Architects; Vancouver, B.C.

Construction Cost: $13.8 million

Square Feet: 38,000

Occupancy: February 2007


Vendors

Chemical Control Systems: ClearWater Tech LLC

Dehumidifiers: Des Champs Technologies

Diving Boards: Duraflex Int'l Corp.

Elliptical Equipment: Technogym USA Corp.

Flooring, Aerobics: Dinoflex Group LP

Flooring, Fitness Center: Dinoflex Group LP

Free Weight Equipment: Technogym USA Corp.

Rowers: Technogym USA Corp.

Stair Climbers: Technogym USA Corp.

Stationary Bikes: Technogym USA Corp.

Strength Equipment: Technogym USA Corp.

Treadmills: Technogym USA Corp.

Water Play Features: Rain Drop Products LLC

 

Post a comment

Name:
Job Title:
Email:
(not published)
Comment:  
(maximum 1,000 characters)  

Project Rating

Rate this Project:


Current Rating:

5.0 based on 1 vote

 

Digital Issue

 

Featured Vendor

 

Related Articles

Hybrid Student Centers House Multiple Campus Functions - Paul Steinbach
By combining multiple student life functions under one roof, even small colleges can create campus buzz.

Who Cares What Building Was the First to Receive LEED Certification? - Andrew Cohen
What was the first building to achieve LEED certification? Who cares?

More Architectural and Marketing Savvy Going Into the Renovation of Spectator Facilities - Andrew Cohen
More architectural and marketing savvy is going into the design and renovation of spectator facilities, as architects and owners try to stave off obsolescence.

Simple Upgrades Can Help Outdated Facilities Stay In the Game - Paul Steinbach
A la carte upgrades can help tired-looking outdoor spectator venues get with the times.

Advances in Glass Are Bringing More Light into Sports and Recreation Buildings - Andrew Cohen
A host of advances in the production of glass is bringing more light more safely into sports and recreation buildings.

Creative Planning Keeps College Recreation Facilities Operating During Renovations - Michael Popke
Creative planning, combined with plenty of patience and sacrifice, helps keep college recreation facilities operating in the midst of a renovation.

More...

 

Facility of the Week

NRH Centre

See project slideshow

 



Facebook   Twitter   LinkedIn   YouTube   YouTube   AB Forum   ABC & Expo

Advertisement



Advertisement



Advertisement