Advertisement

Facilities of Merit 2009: Bracebridge and Muskoka Lakes Secondary School — Bracebridge Sportsplex


          Comments (0)         

View Large Image           Start Slideshow



Bracebridge and Muskoka Lakes Secondary School — Bracebridge Sportsplex

Bracebridge, Ont.

Year in Showcase: 2009

Project Description

The Sportsplex — part of a project that also includes a secondary school and a theater — provides a wide range of health and fitness programs in a vibrant and light-filled setting.

Major amenities include a 12,000-square-foot aquatic center, a 10,000-square-foot gymnastics training facility, a 2,000-square-foot group exercise studio, a 3,200-square-foot strength and stretching studio and a walking/running track with expansive views. A dramatic, daylit gallery serves as a central circulation spine, linking the two principal users (school and sportsplex) and grouping the key public components.

The siting, building, elevations and choice of materials for the complex were inspired by the unique Muskoka landscape, and great care was taken to preserve the natural topography. The complex offers views of the natural landscape, as well as more intimate views of external courtyards. The facade reflects a generous use of glass, as well as wood and stone, two primary materials strongly associated with the region.

The building incorporates several innovative green-design strategies, including heat-activated natural ventilation in common circulation spaces; a reflective, single-ply membrane roof to reduce heat gain and chimney effect; and various site-design measures to maintain and integrate existing site vegetation and topography, allowing natural drainage courses to collect rainwater for reuse.




Judges' Comments

The simple mass of the pool is complemented by the glass curtainwall and the extension of the wood ceiling in the pool into the exterior soffit. This could have been overdone, but it wasn’t.
— Tom Seymour

The skylight atrium is a strong design element full of life and activity. Dramatic views to the landscape allow natural daylight into the major programmatic spaces; this feature is successfully integrated into the facades of the aquatic center to successfully connect the site and landscape with the interior.
— David Dymecki

The owners got a lot of program and value for the investment, and I applaud the incorporation of many innovative green design features.
— Bill Crockett


Project Details

Architect of Record: CS&P Architects Inc.; Toronto, Ont. Allen + Sheriff Architects; Mississauga, Ont.

Construction Cost: $39 million (Canadian)

Square Feet: 236,000

Occupancy: December 2006


Vendors

Floor Covers: Gym-Con Ltd.

Flooring, Aerobics: Gym-Con Ltd.

Lockers: General Storage Systems Ltd.

Scoreboards/Timing Systems: Nevco Scoreboard Company

 

Post a comment

Name:
Job Title:
Email:
(not published)
Comment:  
(maximum 1,000 characters)  

Project Rating

Rate this Project:


Current Rating:

5.0 based on 2 votes

 

Digital Issue

 

Featured Vendor

 

Related Articles

Hybrid Student Centers House Multiple Campus Functions - Paul Steinbach
By combining multiple student life functions under one roof, even small colleges can create campus buzz.

Who Cares What Building Was the First to Receive LEED Certification? - Andrew Cohen
What was the first building to achieve LEED certification? Who cares?

More Architectural and Marketing Savvy Going Into the Renovation of Spectator Facilities - Andrew Cohen
More architectural and marketing savvy is going into the design and renovation of spectator facilities, as architects and owners try to stave off obsolescence.

Simple Upgrades Can Help Outdated Facilities Stay In the Game - Paul Steinbach
A la carte upgrades can help tired-looking outdoor spectator venues get with the times.

Advances in Glass Are Bringing More Light into Sports and Recreation Buildings - Andrew Cohen
A host of advances in the production of glass is bringing more light more safely into sports and recreation buildings.

Creative Planning Keeps College Recreation Facilities Operating During Renovations - Michael Popke
Creative planning, combined with plenty of patience and sacrifice, helps keep college recreation facilities operating in the midst of a renovation.

More...

 

Facility of the Week

Ithaca College Athletics and Events Center

See project slideshow

 



Facebook   Twitter   LinkedIn   YouTube   YouTube   AB Forum   ABC & Expo

Advertisement



Advertisement



Advertisement