Adams 12 Five Star School District — Veterans Memorial Aquatics Center


          Comments (0)         

View Large Image           Start Slideshow



Adams 12 Five Star School District — Veterans Memorial Aquatics Center

Thornton, Colo.

Year in Showcase: 2011

Project Description

Featuring an Olympic-size, 50-meter competitive pool with seating for 800, the Adams 12 Veterans Memorial Aquatics Center not only supports the Adams 12 Five Star School District’s five high schools and eight middle schools, it’s also a venue for local, state and regional competitions.

The facility provides adequate accommodation to swimmers/divers and spectators, while a two-level plan with distinct circulation paths maintains appropriate separation of the two user groups. Durable structural materials such as concrete masonry steel are augmented by brick veneer and precast concrete details. Solar panels on the roof heat the pool’s water, while the translucent, insulated skylight in the natatorium allows for natural light while also preventing glare.

Inside, simple lines and colored graphics articulate the spaces and promote wayfinding. Design concepts reference water, including wave shapes on the railing of the stairs and iconic swim imagery displayed on oversized banners in the natatorium.

The pool’s dehumidification system uses Colorado’s high-altitude and dry outside air to remove moisture from the space, eliminating the need for a more conventional and costly refrigerant-based dehumidification system. Introducing greater amounts of outside air than a conventional system, this system also serves to improve indoor air quality. Large ceiling fans create constant, low-velocity air movement at the pool surface to remove potentially harmful chloramines from the breathing zone of swimmers.



Project Details

Architect Of Record: Barker Rinker Seacat Architecture; Denver, Colo.

Aquatic Design Engineer: Water Technology Inc.; Beaver Dam, Wis.

Programming Consultant : GreenPlay LLC; Lawrence, Kan.

Construction Cost: $16.5 million

Square Feet: 43,570

Occupancy: September 2010


Vendors

Access Ramps/Stairs: Spectrum Aquatics

Bulkheads: Stark Bulkhead Co.

Chemical Control Systems: Becs Technology Inc.

Cleaners/Vacuums: Maytronics Us Inc.

Cleaners/Vacuums: Spectrum Aquatics

Deck/Basin Surface: Monarch Pool Systems

Dehumidifiers: Innovent Air Handling Equipment

Diving Boards: Spectrum Aquatics

Filtration Systems: Neptune-Benson Inc.

Flooring: Srs Flooring

Gutters: Lawson Aquatics Inc.

Heaters: Trane

Ladders/Grab Bars: Spectrum Aquatics

Lane Markers: Antiwave Pool Products

Lighting: Hubbell Lighting Inc.

Lockers: Bradley Corp.

Scoreboard/Timing Systems: Colorado Time Systems

Starting Blocks: Paragon Aquatics, Div. of Pentair

 

Post a comment

Name:
Job Title:
Email:
(not published)
Comment:  
(maximum 1,000 characters)  

Project Rating

Rate this Project:


Current Rating:

4.5 based on 2 votes

 

Digital Issue

 

Featured Vendor

 

Related Articles

Hybrid Student Centers House Multiple Campus Functions - Paul Steinbach
By combining multiple student life functions under one roof, even small colleges can create campus buzz.

Who Cares What Building Was the First to Receive LEED Certification? - Andrew Cohen
What was the first building to achieve LEED certification? Who cares?

More Architectural and Marketing Savvy Going Into the Renovation of Spectator Facilities - Andrew Cohen
More architectural and marketing savvy is going into the design and renovation of spectator facilities, as architects and owners try to stave off obsolescence.

Simple Upgrades Can Help Outdated Facilities Stay In the Game - Paul Steinbach
A la carte upgrades can help tired-looking outdoor spectator venues get with the times.

Advances in Glass Are Bringing More Light into Sports and Recreation Buildings - Andrew Cohen
A host of advances in the production of glass is bringing more light more safely into sports and recreation buildings.

Creative Planning Keeps College Recreation Facilities Operating During Renovations - Michael Popke
Creative planning, combined with plenty of patience and sacrifice, helps keep college recreation facilities operating in the midst of a renovation.

More...

 

Facility of the Week

NRH Centre

See project slideshow

 



Facebook   Twitter   LinkedIn   YouTube   YouTube   AB Forum   ABC & Expo

Advertisement



Advertisement



Advertisement