Auburn University Woltosz Football Performance Center

Auburn, Ala.
Construction Cost: $91.9 million
Area / Square Feet: 233,000
Occupancy Date: January 2023

Dedicated solely to Auburn University’s football program, the Woltosz Football Performance Center is the largest athletics project in school history. Covering 12 acres, the facility includes two full-sized natural grass outdoor fields, a 95,300-square-foot indoor practice facility with a full-sized synthetic turf field, and the 25,000-square-foot player-development lab featuring strength and conditioning equipment and training space.

The complex features a sports performance weight room, locker rooms, team and position meeting rooms, lounge areas and recruiting spaces. 

The design reimagines the college football locker room with the introduction of two separate but adjacent locker rooms for unique purposes. The “huddle” locker room features 125 lockers (each with a zero-gravity chair), plus a lounge, a barbershop and space for players to relax. The “armory” is a dedicated changing area for players to prepare for practice, with direct access to practice areas, equipment storage, laundry and showers.

The facility also houses the program’s sports medicine and nutrition offices, football administration offices, social media suite, recovery suites, equipment room and laundry. Laboratory and equipment spaces were designed for the implementation and advancement 

of football technology related to on-field performance, monitoring, sports medicine and equipment inventory. A remote video command suite features 19 elevated field cameras, a perimeter field GPS anchor array for on-field player tracking, a full-body scanner for on-field performance analysis and equipment customization.

ARCHITECT OF RECORD 

Goodwyn Mills Cawood

Auburn, Ala.

DESIGN ARCHITECT

HOK

Kansas City, Mo.

AQUATIC CONSULTANT

Counsilman-Hunsaker

St. Louis, Mo.

PROJECT VENDORS

Building Systems - Pre-Engineered Structures
Covenant Steel Warehouse
Building Systems - Skylights
Kistler-McDougall Corporation

Fitness Center - Assessment & Monitoring Equipment

Multiple
Fitness Center - Cardiovascular Equipment
Hammerstrength
Fitness Center - Entertainment Systems
Daktronics Inc.
Fitness Center - Flooring, Aerobics
PLAE Vertical Inc.
Fitness Center - Flooring, Fitness Center
Vanguard Commercial Flooring
Fitness Center - Free-Weight Equipment
Hammerstrength
Fitness Center - Strength Equipment
Hammerstrength
Gymnasium/Field House/Arena - Lighting
Musco
Gymnasium/Field House/Arena - Scoreboards/Timing Systems
Victory Game Clocks

Gymnasium/Field House/Arena - Sound Systems
Danley

Gymnasium/Field House/Arena - Wall Padding
Sportsgraphics
Indoor Sports Surfaces - Multipurpose
Sports Turf Company
Laundry - Dryers
Integrated Sports Specialties
Laundry - Washers
Integrated Sports Specialties
Locker/Shower - Flooring
Vanguard Commercial Flooring
Locker/Shower - Lockers
Longhorn Locker Company
Locker/Shower - Saunas/Whirlpools
HydroWorx International
Locker/Shower - Shower/Toilet Partitions
ASI
Outdoor Facilities/Stadiums - Football Goal PostsSports Turf Company
Outdoor Facilities/Stadiums - Lighting
Musco
Outdoor Facilities/Stadiums - Scoreboards
Victory Game Clocks
Outdoor Facilities/Stadiums - Sports Surfaces
Sports Turf Company
Pools - Access Ramps/Stairs
HydroWorx International
Pools - Chemical Control Systems
HydroWorx International
Pools - Cleaners/Vacuums
HydroWorx International
Pools - Covers
HydroWorx International
Pools - Deck/Basin Surface
HydroWorx International
Pools - Dehumidifiers
HydroWorx International
Pools - Filtration Systems
Cox Pools of the Southeast
Pools - Gutters
Cox Pools of the Southeast
Pools - Heaters
Cox Pools of the Southeast
Pools - Ladders/Grab Bars
Cox Pools of the Southeast
Pools - Lighting
Cox Pools of the Southeast
Pools - Sanitization Systems
Cox Pools of the Southeast
Training Facilities - Hydrotherapy Tanks
HydroWorx International