Dillon Family Aquatic Center

Dillon Family Aquatic Center

Fremont, NE 2019

Project Description

POOL FOR ALL
The Dillon Family Aquatics Center was designed to serve Fremont Family YMCA members, the Midland College swim team, the high school swim team, and competitive swimmers in the region. One of the YMCA's primary goals is to ensure that every first-grader in the Fremont school system has lessons to become a competent swimmer. The Olympic-sized pool accommodates swim lessons, aquatics classes and Fremont's larger swimming community.

REGIONAL DESTINATION
The desire to work within the limits of a capital campaign, all contributed to design decisions. Precast concrete was selected for its ability to hold up to an indoor pool environment. Acoustical metal deck provides excellent sound control, and its long spans allowed for a minimum of structural trusses. A very economical floor tile was specified for the public spaces, and concrete was left exposed where feasible. Fabric ductwork resists corrosion and provides a significant visual impact to the natatorium.


Project Details

Architect: WNB Architects
Construction Cost: $12.4 million
Square Feet: 33,400
Occupancy: January 2018

Access Ramps/Stairs - : Spectrum Aquatics

Filtration Systems: Pentair Commercial Aquatics

Filtration Systems - : Neptune Benson Inc.

Ladders/Grab Bars - : Spectrum Aquatics

Lane Markers - : Competitor Swim

Locker/Shower - Saunas/Whirlpools: Am-Finn Sauna

Locker/Shower - Swimsuit Extractors: Extractor Corp./ SUITMATE

Scoreboard/Timing Systems - : Colorado Time Systems

Starting Blocks - : Spectrum Aquatics

Architect Of Record

WNB Architects
Kansas City, MO

Aquatic Engineer

Larkin Aquatics
Kansas City, MO

Civil Engineer

Olsson Associates
Lincoln, NE

Structural Engineer

Structural Engineering Associates
Kansas City, MO

  •