Upper Arlington Aquatic Center

Upper Arlington, Ohio
Construction Cost: $85 million
Area / Square Feet: 4,479
Occupancy Date: May 2025

The City of Upper Arlington proudly opened the Bob Crane Community Center in 2025 β€” a transformative, five-story, 165,000-square-foot destination designed to unite the community. The $85 million project was funded through municipal bonds and over $8 million in private donations via the Upper Arlington Community Foundation, reflecting a shared commitment to multigenerational wellness and civic life. At the heart of the center is a year-round aquatics facility. The 4,479-square-foot leisure pool features four lap lanes, a zero-depth-entry play area, open water for recreation and fitness, plus engaging amenities such as a basketball hoop and a waterslide β€” all within a single, flexible body of water. Beyond recreation, the center also integrates wellness partnerships. The Ohio State University Wexner Medical Center leases space for physical therapy, integrative health and its Exercise is Medicine program β€” bridging clinical care with community health. Sustainable design elements, including rooftop solar panels, reinforce the center’s future-focused mission. The Bob Crane Community Center stands as a vibrant symbol of Upper Arlington’s investment in connection, inclusion and lifelong enrichment.

Lead Architect

MSA Design

Aquatic Design Consultant

Water Technology Inc.

Components

  • Leisure pool with lap lanes and zero-depth entry play area
  • Basketball hoop
  • Waterslide

Suppliers

BECS TechnologyChemical Control Systems
Competitor SwimLane Markers
Fluidra/S.R.SmithADA Lifts, Basketball Hoop
Hussey Seating CompanyBleachers
Paddock Pool Equipment CompanyGutters
Neptune Benson/XylemFiltration Systems, Sanitization Systems
SplashtacularWaterslides