Derry Township Community Center

Derry, Pa.
Construction Cost: $32 million
Area / Square Feet: Withheld
Occupancy Date: June 2022

A comprehensive analysis of the competitive swimming landscape at both regional and statewide levels empowered the Town of Derry to make informed decisions regarding the potential capacity of a future aquatic center in terms of hosting competitive events. A thorough financial analysis of competitive swimming events was also completed, encompassing revenue projections and facility utilization.

The result is a sprawling 90,000-square-foot community center that boasts an impressive array of amenities, including an indoor 25-yard competition pool, an indoor leisure pool, an outdoor leisure pool and an outdoor sprayground. The facility also houses a senior center, a teen center, a full-sized gymnasium, a state-of-the-art fitness center, and a collection of versatile multipurpose meeting and program rooms.

LEAD ARCHITECT

Kimmel-Bogrette

AQUATIC DESIGN CONSULTANT


Counsilman-Hunsaker

COMPONENTS

  • 5,635-square-foot indoor competition pool with nine 25-yard lap lanes
  • Two 1-meter diving boards
  • Timing system and scoreboard
  • 4,800-square-foot indoor leisure pool with four 25-yard lap lanes
  • Underwater bench seating
  • Play structure
  • Water basketball
  • Water volleyball
  • Indoor/outdoor waterslide
  • 962-square-foot outdoor sprayground
  • 12,820-square-foot outdoor leisure pool with six 25-yard lap lanes
  • Two 1-meter diving boards
  • Two water basketball goals
  • Water volleyball
  • Waterslide
  • Underwater bench

SUPPLIERS 

Chemical Control SystemsBECS Technology Inc.
Scoreboard/Timing Systems
Colorado Time Systems
Lane Markers
Competitor Swim
 Filtration Systems, Gutters
Neptune Benson/Xylem
Access Ramps/Stairs, ADA Lifts, Ladders/Grab Bars, Starting Blocks
Spectrum Aquatics
Cleaners/Vacuums
Recreonics Inc.