Berthoud Recreation Center at Waggener Farm Park

Berthoud, Colorado
Construction Cost: $32 million
Area / Square Feet: 49,000 (total project), 13,000 (aquatics)
Occupancy Date: November 2021

Waggener Farm Park Recreation Center is the Town of Berthoud’s first-ever recreation center. With a grand opening in November 2021, this unique $32 millecreation center was funded through local sales tax revenue that was driven by a spike in the population.

The state-of-the-art recreation center is located on the west side of town and features a gymnasium, a fully equipped fitness center and an aquatics area.

The design incorporates several characteristics of small-town Berthoud, such as native grasses and open space. The contemporary and clean design reflects the agriculturally rich history of Berthoud with a modern twist.

The family-friendly aquatic center showcases something for everyone in the family. For more active users, the three-lane lap pool and the two-story water slide complex are perfect to exert some energy. The aquatics center also features a current channel and leisure pool with a play structure, as well as interactive water features that provide relaxation and play opportunities. The unique rock structure climbing wall engages users in all levels  of play and competition, providing visitors with an experience that feels uniquely outdoor while benefitting from the indoor environment year-round.

ARCHITECT OF RECORD

Barker Rinker Seacat 

AQUATIC DESIGN CONSULTANT 

Water Technology Inc. 

COMPONENTS

• Three-lane lap pool 

• Two-story water slide 

• Current channel 

• Leisure pool 

• Play structure 

• Climbing wall 

SUPPLIERS 

Chemical Control Systems
BECS Technology Inc.
Lane Markers
Competitor Swim
Filtration Systems, Sanitization Systems
Neptune Benson/Evoqua
Filtration Systems, Gutters
Paddock Pool Equipment Co.