The Wellesley Pool Addition constitutes the second phase of an initial project completed in 2005 — the Wellesley Community Centre. This addition builds off the existing eastern elevation into a previously unprogrammed lawn area to mediate a connection between the city’s urban core and St. Jamestown, one of Canada’s densest and most ethnically diverse communities.
Clad in glass and custom-profile zinc, the addition houses a light-filled aquatics hall with a five-lane, 25-meter lap pool, a leisure and hydrotherapy pool, and a steam room. Following consultation with the community, a planned waterslide was replaced with a diving platform that has an integrated waterfall feature. The original changeroom programming has been expanded and updated into a pair of universally accessible changerooms separated from the staff areas and pool deck by tiled partitions that are punctured by glazed slots to maintain a discreet visual connection between these spaces. New spaces also include two multipurpose rooms, a staff office and an interior bridge that marries the addition to the existing structure. A green roof divides the volumes housing the aquatics hall and multipurpose rooms, forming a rooftop “meadow” visible from the interior public corridor.
Despite its restricted budget and the ambition of its program, the existing center has been lauded as a success story for the St. James Town neighborhood, both as a highly functional hybrid civic building and as an example of “beauty on a budget.” Two decades after the aquatics programming was removed from the original plan due to budgetary restrictions, the pool addition will complete the city’s vision for a “full community center program” to serve this vibrant high-needs neighborhood. The addition will continue the center’s legacy by providing previously lacking programming within a well-proportioned volume that respects the context of the neighborhood.
ARCHITECT OF RECORD
MJMA Architecture & Design
Toronto, Ont.
PROJECT VENDORS
Pools - Sanitization Systems | Aquionics |
Locker/Shower - Shower/Toilet Partitions | Bobrick Washroom Equipment Inc. |
Pools - Chemical Control Systems | Chemtrol |
Locker/Shower - Lockers | Columbia Lockers |
Pools - Lane Markers | Competitor Swim |
Pools - Scoreboard/Timing Systems | Competitor Swim |
Locker/Shower - Saunas/Whirlpools | Dal-Tile Corp. |
Locker/Shower - Flooring | Dal-Tile Corp. |
Pools - Deck/Basin Surface | Dal-Tile Corp. |
Pools - Dehumidifiers | Dectron |
Pools - Filtration Systems | |
Pools - Gutters | Grille: Emco, Gutter: Cast in Place |
Pools - Heaters | Heat Exchanger: Armstrong |
Pools - Lane Markers | Paragon Aquatics |
Pools - Water Play Features | Progress Plastics |
Pools - Water Play Features | Rain Drop Products LLC |
Pools - Ladders/Grab Bars | |
Pools - Starting Blocks | |
Locker/Shower - Swimsuit Extractors | SUITMATE by Extractor Corp. |