The creation of the Klein Family Natatorium and the new Performance Gymnasium began in 2020, thanks to the kindness of several generous donors. Designed to promote aquatics programming for students in every school division, the 30,000-square-foot Klein Family Natatorium features a competition pool, a warm-up pool and seating for more than 700 spectators and student-athletes. Both pools provide ample practice space for the middle school and varsity swim teams.
The performance gym is designed for basketball, volleyball, wrestling and special events, and accommodates 1,200 spectators for competitions. The facility also adds a new home for the strength and conditioning program, a new wrestling/multipurpose room, a new administrative office suite, modern concessions, additional gym storage and abundant corridor/reception space.
LEAD ARCHITECT
Little
AQUATIC DESIGN CONSULTANT
COMPONENTS
- 5,750-square-foot competition pool with eight 25-yard lap lanes
- In-deck timing system with LED video scoreboard
- 3,000-square-foot warm-up pool with five 25-yard lap lanes
- Underwater bench
SUPPLIERS
Scoreboard/Timing Systems | Colorado Time Systems |
ADA Lifts | Fluidra/S.R.Smith |
Circulation Pumps, Filtration Systems, Gutters, Ladders/Grab Bars | Paddock Pool Equipment Co. |